ECoR to introduce 2×25 KV Overhead Electrification System in 5 railway sections to enhance train operations

Bhubaneswar, November 12: To enhance electrification infrastructure with the introduction of the 2×25 KV Overhead Electrification (OHE) system, the East Coast Railway has planned to convert five railway sections – Bhadrak-Khurda Road, Palasa-Vizianagaram, Cuttack-Paradeep, Cuttack-Talcher-Angul and Vizianagaram-Rayagada – from the existing 1×25 KV OHE system to the 2×25 KV system. This move is aimed at […]

Continue Reading